Kitchens
A working kitchen is a services plan with cupboards on it
Australian kitchens fail on aisle width, rangehood duct, and appliances locked too late — not on handle style. Start with the footprint, then the finishes.
4–8 weeks
Same-footprint mid-range duration
4–10 wks
Custom joinery lead
Plan 10–16+
Power points, modern cook’s kitchen
Before cabinets
Lock appliances
In this hub
Start with a child page

Choose
Kitchen layouts
Galley, L-shape, U-shape, island, and peninsula — what actually fits a narrow Australian room.
Learn more →

Materials
Benchtops
Laminate vs stone vs porcelain, waterfall edges, and heat, stain, and budget trade-offs.
Learn more →

Storage
Cabinets & storage
Carcass materials, door styles, and how to brief a kitchen designer on storage you will actually use.
Learn more →

Money
Appliances
How to budget appliances inside a reno without blowing the joinery package.
Learn more →

Finish
Splashbacks
Tile, glass, slab, and stainless — what is easiest to clean behind a cooktop.
Learn more →

Power
Lighting & power
Task lighting, ambient layers, and how many power points a modern kitchen needs.
Learn more →
What visitors always ask
How long does a kitchen renovation take?+
A same-footprint mid-range kitchen in an occupied house is often on site for about four to eight weeks after joinery is ready, plus several weeks of design and manufacturing before anyone demolishes. Custom stone templating adds days after cabinets are in. Layout changes, structural work, or a house that must keep a temporary kitchen can stretch the calendar into months. Lead times for cabinets and appliances are frequently longer than the install itself.
How do I brief a kitchen designer?+
Bring a measured plan, photos, a list of what must be stored, who cooks at the same time, appliance models you will not change, and a planning-band budget with a contingency. Say whether the sink, cooktop, and fridge can move. Ask for a lighting and power plan in the same pack as the elevations. A brief that is only a Pinterest board produces a kitchen that looks styled and works poorly.
How many power points does a modern kitchen need?+
Enough that small appliances do not share a single overloaded point on the bench. Many contemporary Australian kitchens plan a bank at the main prep run, points at an island or peninsula if you have one, dedicated circuits for oven, cooktop, dishwasher and sometimes a fridge ice-maker, plus points for a coffee machine, kettle, toaster, air fryer, and chargers. Exact counts and circuits are an electrician’s design — we do not invent amps. Count the appliances you actually own, then add two.
Should I keep the kitchen footprint or move the sink?+
Keep the footprint if the current walls still work: it is the largest cost and disruption control you have. Move the sink, cooktop, or fridge only when the existing diagram is genuinely unusable — that change is a small building project attached to a kitchen, not a styling tweak.