Budget the working kitchen as a package

Kitchens · Appliances

Budget the working kitchen as a package

Appliances are not a leftover. They set carcass widths, circuits, and whether the rangehood can actually leave the building.

Before cabinets

Lock models

600 vs 900

Width fork

Extraction duct

Hidden cost

Cook + clean + cold

Package idea

Independent guide — not a contractor. Planning information only. Confirm licences, waterproofing, and quotes with qualified trades and the relevant state authority.

Appliance package planning (Australia)
JobUsual conversationWhat locks the joinery
Cook600 mm apartment default; 900 mm suburban defaultExact oven / cooktop / upright SKU and hinge side
ExtractDucted to outside whenever the building allowsCanopy width, duct path, recirculating only as a compromise
WashDishwasher sized to the bayDoor swing versus the sink; extra-tall models
ColdFridge that still opens at an islandDepth, integrated door, ice-maker circuit if specified

Not a product list. Lock model numbers before cabinets are cut. Circuits and extraction are electrician / installer items.

What visitors always ask

How do I budget appliances in a kitchen reno?+

Set a package number first — cooktop, oven (or upright), rangehood, dishwasher, and fridge — then pick models that fit the leftover after joinery and benches. Mid-range Australian packages are often a meaningful slice of a $25,000–$55,000 kitchen band; premium built-ins can rival the cabinets. Do not leave appliances as “whatever is on sale in week six”. Cabinets will already have been cut. Include installation, disposal of old units, and any circuit upgrades in the same list.

When do I lock appliance model numbers?+

Before the joiner cuts carcasses. Give them the SKU, hinge side, ventilation gaps, and whether the dishwasher is extra-tall. Delivery should land on the same timeline as cabinet install — not six weeks early in a garage, and not a week late to stall a stone template.

Keep reading

Australia · kitchens & bathrooms

Make a renovation day of it

Whether you have a weekend cosmetic refresh or a full wet-area rebuild, start with the checklist, then read the cost bands with their assumptions still attached.