Plan

The order the trades already know

A renovation is a queue. This is the kitchen sequence Australians actually run — with bathroom waterproofing slotted where it belongs.

8

Kitchen stages

Membrane + test

Bathroom extra

Appliance SKUs

Lock before factory

10–20%

Contingency talk

Independent guide — not a contractor. Planning information only. Confirm licences, waterproofing, and quotes with qualified trades and the relevant state authority.

Typical kitchen renovation order of works (Australia)
StageUsually happensDo not skip
1. Brief & measureSite measure, services search, asbestos awareness on older homesA written scope and a contingency (often discussed at 10–20%)
2. Design & selectionsLayout, joinery shop drawings, appliance models, lighting planLock appliances before cabinets are built
3. Approvals & licencesOnly if walls, windows, wet-area class, or plumbing work requires itState building authority + licensed plumber, not a weekend video
4. Strip & make-safeDemo, waste, temporary kitchen if neededDust, neighbours, and live services isolation
5. Structure & servicesWalls, plaster, electrical first-fix, plumbing rough-inPower-point count and rangehood duct path
6. Floors / walls ready for joineryLevel substrate, paint first coatAppliance delivery dates vs cabinet install
7. Cabinets, benchtops, splashbackInstall, template stone, splashback last or with stoneSilicone and movement joints as specified
8. Second-fix & handoverAppliances, lights, doors, clean, defects listWarranties, manuals, and who to call for leaks

Sequence varies. Bathrooms insert waterproofing and flood-testing before tiling. Confirm with your builder or project manager.

What visitors always ask

What order should kitchen renovation trades follow?+

Typical Australian sequence: brief and measure; design and lock appliances; check approvals and licences; strip-out; structure and first-fix electrical/plumbing; prepare surfaces; install cabinets then benchtops then splashback; second-fix appliances and handover. Bathrooms insert waterproofing and any required flood test or inspection after rough-in and before tiling. Your builder may merge steps; they should not tile a wet area before the membrane is accepted.