The sequence Australian kitchen renovations actually follow — and where money leaks if you skip a step.
Published 21 September 2026
Independent guide — not a contractor. Planning information only. Confirm licences, waterproofing, and quotes with qualified trades and the relevant state authority.
Brief and measure; lock appliances in the design; check licences and any approvals; strip; first-fix electrical and plumbing; cabinets; benchtop template and install; splashback; second-fix and handover. Do not manufacture cabinets before the SKUs are real.
A same-footprint mid-range kitchen in an occupied house is often discussed as about four to eight weeks on site after joinery is ready, plus design and manufacturing before anyone demolishes. Custom stone templating adds days after cabinets are in. Layout changes, structural work, or a house that must keep a temporary kitchen can stretch the calendar into months.
Bathrooms insert a membrane week after plumbing rough-in and before tile. If both rooms share one occupation, sequence the wet area so it is not waiting on a kitchen stone template, and do not book a waterproofer before the plumber has finished the wastes.
Renovation checklist
The printable order of works.
Cosmetic refresh vs full renovation
How Australians tell a paint-and-tapware job from a strip that redoes joinery or a wet-area membrane — in both kitchens and bathrooms.
Hard water tapware Australia
WELS, WaterMark, serviceable aerators, and finishes that survive Australian hard-water regions — kitchens and bathrooms.
Australia · kitchens & bathrooms
Whether you have a weekend cosmetic refresh or a full wet-area rebuild, start with the checklist, then read the cost bands with their assumptions still attached.